NP Z8 - Work on the underside and in the Cab

Work is done underside of the boiler, more pipes to run. Then the running gear gets some work. And the backhead in the cab is installed... lots of pipes and valves.
CWRR_20260214a
CWRR_20260214b
CWRR_20260214c
CWRR_20260214d
CWRR_20260214e
CWRR_20260214f
CWRR_20260214g